Monday, March 15, 2010

5-Day Comment Period On Corps Chicago Barrier System EA Plan

Mar 15: In a very brief Federal Register announcement [75 FR 12217] the U.S. Army Corps of Engineers, Chicago District is providing a 5 day public notice and comment period on a planned Environmental Assessment relating to Chicago Sanitary and Ship Canal Dispersal Barriers System. According to the notice, the Corps is directed to conduct a study of technologies that may enhance the efficacy of the Chicago Sanitary and Ship Canal Dispersal Barriers System. The study is structured as a series of interim reports. The Corps says, "Interim Report IIIa, limited to the impacts of implementing additional in-stream barrier/deterrent technologies at key locations in the Illinois and Chicago Area Waterways is the focus of this planned EA."
 
    The specific technologies under consideration include acoustic deterrents, air bubble curtains, and strobe lights used both individually and in combination. Comments are requested to assist in determining the level of analysis and impacts to be considered for implementing these in-stream barrier/deterrent technologies. The Corps indicates that comments received by the on the proposed EA will be considered fully for the Federal action associated with the Project. Comments concerning the level of analysis or impacts to be considered in the draft Environmental Assessment should be provided by March 19, 2010.
    Access the complete FR announcement with details on commenting (click here).

No comments: