Tuesday, January 26, 2016

Chicago Area Waterways Advisory Committee letter to President Obama and Congress

<>  Chicago Area Waterways Advisory Committee letter to President Obama and Congress - The CAWS Advisory Committee has considered options in the Great Lakes Mississippi River Interbasin Study (GLMRIS) developed by USACE, along with additional information provided by technical consultants, and has identified further information needed to design and select a long-term solution -- the letter details the needs and further states that the requested "Chief's Report and accompanying information should be in sufficient detail for decisionmakers at the local, state, and federal levels to determine how to move forward with a long-term solution."